Festival · the site · planning

Where everything will stand.

One field by the river, fourteen zones, one walking loop. The drawing comes later; the scheme is here now, so you can tell us what is missing before a single stake goes in the ground.

Our plan for 7–8 August 2027 at LeBreton Flats, subject to permits

The scheme, five fields
FieldZones
The middle01–03 · pavilions, two stages
The eating end04–05 · kitchen street, craft row
The quiet end06–07 · kids, quiet zone
Water and washrooms08–10 · water and washrooms
The edges11–14 · gates, info, aid, bikes

The ground.

LeBreton Flats Park sits on the Ottawa River between the Canadian War Museum and the Pimisi O-Train station. It is federal land, flat, open and served by one train stop at the gate — which is why we picked it.

Venue · applied for, not granted

Everything below is what we intend to build on that field. Permission to build it belongs to the National Capital Commission, and the application goes in this autumn. Until the NCC signs, this page describes an intention with a date on it.

The scheme is public this early on purpose. A community that needs its cooking fire near a water point, a vendor who needs a van at the back of the row, a family that needs the quiet tent within sight of the kids' workshops — all of that is cheap to change on a page and expensive to change on a field.

Pimisi O-Train Line 1 station at the gate National Capital Commission · the LeBreton Flats Park page names the station
NCC Who the ground belongs to LeBreton Flats Park is federal land administered by the National Capital Commission
A straight-down aerial of a festival ground: white marquees, rows of food trucks, green walkways, a sand play area and two coloured circus tents laid out between the roads and the river.
A field laid out for two days: marquees, food trucks, green walkways, two circus tents · the measured plan comes later

The middle.

Pavilions and stages hold the centre, so the walk from any tent to any music is short and the sound carries across open grass.

Field 01 · zones 01–03

One open-fronted market tent taken out of a long row, its coloured awning above a wooden counter of goods, visitors walking the gravel lane.
Zone 01 at eye level · one tent out of the village the aerial shows from above

One stage in the working budget · the second is drawn in and waits on 15 February 2027

01

Pavilion village

One tent per community, each with its own kitchen, its own table and its own hour on the programme. The village is the centre of the field and everything else arranges itself around it.
02

Main stage

Faces the open lawn, so the audience stands on grass and the speakers point away from the neighbours. Anchor performances, opening and closing.
03

Second stage · held above the funding gate

Smaller, set inside the village, for every group that has twenty minutes, a drum and something to show. The working budget carries one stage. A second stage opens on the day confirmed cash clears the threshold at the cash gate on 15 February 2027, and this zone keeps its place in the scheme until that answer arrives.

The measured plan lands in summer 2027.

Until then this page carries the scheme, and the scheme is still soft.

Site scheme · revision 1 · 28 August 2026

Field 02 · zones 04–05 · kitchen street, craft row

The eating end.

Cooking and making run along one line, so the whole street is one walk and the row of makers faces it the entire way.

Two facing rows of food stalls at dusk, skewers over a charcoal grill and a deep pot being stirred, crates of chillies and aubergines along the front.
Zones 04 and 05 face each other across one walking line

Vendor and maker applications open winter 2027 · pavilion kitchens are placed with the communities from autumn 2026

04

Kitchen street

A single walking line with pavilion kitchens opening onto it. Prices stay at family level, and every dish is cooked by the community that owns the recipe.
05

Craft row

Makers at tables: embroidery, ceramics, jewellery, print, wood. Whoever sells at this row made the thing they are selling.
Field 03 · zones 06–07 · kids, quiet zone

The quiet end.

Children and rest get their own corner of the field, far enough from the speaker line that a two-year-old can sleep through the headliner.

The quiet zone is a fixed commitment of this festival and appears on every version of this map

06

Kids and learning

Workshops with one thing to make and carry home, a story hour, and the language corner for children growing up between two of them.
07

Quiet zone

A shaded tent out of the sound line: no programming, low light, seating, room for a pram and a wheelchair. Any volunteer can walk you to it.
Field 04 · zones 08–10 · water, washrooms

Water and washrooms.

The boring half of a map is the half people look for first. It gets marked before the stages do.

08

Water points

Free, refillable, spread so that no zone is a long walk from one. Bring a bottle and fill it as often as you like.
09

Washrooms

Banks at the ends of the walking loop, each within sight of the zone it serves, with a servicing lane behind them.
10

Accessible washrooms

In every bank, on hard level ground, near the gates and near the quiet zone, with lit paths between them.
15 + 8 Toilets and sinks per 1,000 people on site at once ANSI/PSAI Z4.4-2025, nine-hour day, no alcohol · the standard our count is sized against
Free Drinking water on the site Our own decision, and it stays on every version of this map
Field 05 · zones 11–14 · gates, info, first aid, bikes

The edges.

Gates, help and wheels sit on the perimeter, where an ambulance can reach them and a lost phone can be handed in without crossing the field.

Gate positions and vehicle lanes are set with the fire service and the paramedics in spring 2027

11

Entrances

Walking in is free. The main gate faces Pimisi station, a second gate takes vehicles and deliveries, and the accessible drop-off with a Para Transpo bay sits beside the main gate.
12

Info desk

Inside the main gate. Programme times, lost people, lost children, lost phones, accessibility requests, and the volunteer whose whole job is removing barriers on the day.
13

First aid

Staffed, signed and central, on a lane wide enough for a vehicle to come in and go out without moving the crowd.
14

Bike parking

Racks at the main gate, watched during opening hours, sized for a summer Saturday when half the city arrives on two wheels.

What turns this into a drawing.

Four dates stand between the scheme above and a measured plan with distances on it. Each one is a document, an office and an answer we do not have yet.

Permit track · NCC and the City

  1. October 2026Planned Event permit application to the NCC Filed early. At equal level the Commission gives the date to the application that arrived first.
  2. 8 May 2027Planned Hard deadline for that application Ninety days of notice is what a high-impact event on federal land owes the NCC.
  3. Spring 2027Planned Site plan drawn with the fire service, paramedics and our accessibility volunteer Gate widths, vehicle lanes, evacuation routes, the Para Transpo bay and the lit accessible route are settled here.
  4. Summer 2027Planned The measured plan published on this page Zone by zone, with distances, the accessible route and the printable version.

Where to go next.

The scheme above turns into a route, a gate rule and a programme on four other pages.

Festival · 04 of 07

Help draw the map.

Communities pick where their pavilion sits, and those conversations start this autumn. Vendors pick their frontage and volunteers walk the loop when both intakes open in winter 2027. Everything anyone says before then still moves a zone.